资源类型

期刊论文 1738

会议视频 43

年份

2024 3

2023 149

2022 179

2021 156

2020 143

2019 127

2018 109

2017 114

2016 82

2015 93

2014 58

2013 45

2012 38

2011 47

2010 50

2009 53

2008 56

2007 73

2006 49

2005 37

展开 ︾

关键词

遗传算法 10

神经网络 9

优化 7

医学 5

可持续发展 5

多目标优化 4

智能制造 4

机器学习 4

目标识别 4

稳健设计 4

能源 4

预测 4

BP神经网络 3

COVID-19 3

人工智能 3

信息技术 3

工程管理 3

环境 3

算法 3

展开 ︾

检索范围:

排序: 展示方式:

Novel slack-based robust scheduling rule for a semiconductor manufacturing system with uncertain processing

Juan LIU, Fei QIAO, Yumin MA, Weichang KONG

《工程管理前沿(英文)》 2018年 第5卷 第4期   页码 507-514 doi: 10.15302/J-FEM-2018045

摘要:

The NP-hard scheduling problems of semiconductor manufacturing systems (SMSs) are further complicated by stochastic uncertainties. Reactive scheduling is a common dynamic scheduling approach where the scheduling scheme is refreshed in response to real-time uncertainties. The scheduling scheme is overly sensitive to the emergence of uncertainties because the optimization of performance (such as minimum make-span) and the system robustness cannot be achieved simultaneously by conventional reactive scheduling methods. To improve the robustness of the scheduling scheme, we propose a novel slack-based robust scheduling rule (SR) based on the analysis of robustness measurement for SMS with uncertain processing time. The decision in the SR is made in real time given the robustness. The proposed SR is verified under different scenarios, and the results are compared with the existing heuristic rules. Simulation results show that the proposed SR can effectively improve the robustness of the scheduling scheme with a slight performance loss.

关键词: semiconductor manufacturing system     uncertain processing time     dynamic scheduling     slack-based robust scheduling rule    

Reliability-based robust design optimization of vehicle components, Part I: Theory

Yimin ZHANG

《机械工程前沿(英文)》 2015年 第10卷 第2期   页码 138-144 doi: 10.1007/s11465-015-0333-2

摘要:

The reliability-based design optimization, the reliability sensitivity analysis and robust design method are employed to present a practical and effective approach for reliability-based robust design optimization of vehicle components. A procedure for reliability-based robust design optimization of vehicle components is proposed. Application of the method is illustrated by reliability-based robust design optimization of axle and spring. Numerical results have shown that the proposed method can be trusted to perform reliability-based robust design optimization of vehicle components.

关键词: vehicle components     reliability-based design optimization     reliability-based sensitivity analysis     multi-objective optimization     robust design    

Reliability-based robust design optimization of vehicle components, Part II: Case studies

Yimin ZHANG

《机械工程前沿(英文)》 2015年 第10卷 第2期   页码 145-153 doi: 10.1007/s11465-015-0334-1

摘要:

The reliability-based optimization, the reliability-based sensitivity analysis and robust design method are employed to propose an effective approach for reliability-based robust design optimization of vehicle components in Part I. Applications of the method are further discussed for reliability-based robust optimization of vehicle components in this paper. Examples of axles,torsion bar, coil and composite springs are illustrated for numerical investigations. Results have shown the proposed method is an efficient method for reliability-based robust design optimization of vehicle components.

关键词: vehicle axles and springs     reliability-based design optimization     reliability-based sensitivity analysis     multi-objective optimization     robust design    

Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times

Pankaj SHARMA,Ajai JAIN

《机械工程前沿(英文)》 2014年 第9卷 第4期   页码 380-389 doi: 10.1007/s11465-014-0315-9

摘要:

Stochastic dynamic job shop scheduling problem with consideration of sequence-dependent setup times are among the most difficult classes of scheduling problems. This paper assesses the performance of nine dispatching rules in such shop from makespan, mean flow time, maximum flow time, mean tardiness, maximum tardiness, number of tardy jobs, total setups and mean setup time performance measures viewpoint. A discrete event simulation model of a stochastic dynamic job shop manufacturing system is developed for investigation purpose. Nine dispatching rules identified from literature are incorporated in the simulation model. The simulation experiments are conducted under due date tightness factor of 3, shop utilization percentage of 90 % and setup times less than processing times. Results indicate that shortest setup time (SIMSET) rule provides the best performance for mean flow time and number of tardy jobs measures. The job with similar setup and modified earliest due date (JMEDD) rule provides the best performance for makespan, maximum flow time, mean tardiness, maximum tardiness, total setups and mean setup time measures.

关键词: scheduling     stochastic dynamic job shop     sequence-dependent setup times     dispatching rule     simulation    

A carbon efficiency upgrading method for mechanical machining based on scheduling optimization strategy

Shuo ZHU, Hua ZHANG, Zhigang JIANG, Bernard HON

《机械工程前沿(英文)》 2020年 第15卷 第2期   页码 338-350 doi: 10.1007/s11465-019-0572-8

摘要: Low-carbon manufacturing (LCM) is increasingly being regarded as a new sustainable manufacturing model of carbon emission reduction in the manufacturing industry. In this paper, a two-stage low-carbon scheduling optimization method of job shop is presented as part of the efforts to implement LCM, which also aims to reduce the processing cost and improve the efficiency of a mechanical machining process. In the first stage, a task assignment optimization model is proposed to optimize carbon emissions without jeopardizing the processing efficiency and the profit of a machining process. Non-dominated sorting genetic algorithm II and technique for order preference by similarity to an ideal solution are then adopted to assign the most suitable batch task of different parts to each machine. In the second stage, a processing route optimization model is established to plan the processing sequence of different parts for each machine. Finally, niche genetic algorithm is utilized to minimize the makespan. A case study on the fabrication of four typical parts of a machine tool is demonstrated to validate the proposed method.

关键词: Low-carbon manufacturing     carbon efficiency     multi-objective optimization     two-stage scheduling     job shop    

Robust control of

Xueyan TANG, I-Ming CHEN

《机械工程前沿(英文)》 2009年 第4卷 第1期   页码 25-34 doi: 10.1007/s11465-009-0004-2

摘要: This article describes the development of an flexure-based micromanipulator, with the features of decoupled kinematic structure, large motion range, high positioning precision, and fast response. The large motion range of flexure mechanisms is quantified by a given definition. Based on the given definition, large motion is achieved in the mechanical design of the -flexure parallel mechanism (FPM). To ensure high positioning precision and fast dynamic response, a hybrid control algorithm with both position control and vibration control are designed, using the H -theory. The controller strongly solves the three common problems of flexure mechanisms simultaneously, including unmodeled uncertainties, the external disturbances and vibration caused by inherent low damping.

关键词: robust control     flexure mechanisms     flexure-based micromanipulator    

Multi-objective optimization for the multi-mode finance-based project scheduling problem

Sameh Al-SHIHABI, Mohammad AlDURGAM

《工程管理前沿(英文)》 2020年 第7卷 第2期   页码 223-237 doi: 10.1007/s42524-020-0097-1

摘要: The finance-based scheduling problem (FBSP) is about scheduling project activities without exceeding a credit line financing limit. The FBSP is extended to consider different execution modes that result in the multi-mode FBSP (MMFBSP). Unfortunately, researchers have abandoned the development of exact models to solve the FBSP and its extensions. Instead, researchers have heavily relied on the use of heuristics and meta-heuristics, which do not guarantee solution optimality. No exact models are available for contractors who look for optimal solutions to the multi-objective MMFBSP. CPLEX, which is an exact solver, has witnessed a significant decrease in its computation time. Moreover, its current version, CPLEX 12.9, solves multi-objective optimization problems. This study presents a mixed-integer linear programming model for the multi-objective MMFBSP. Using CPLEX 12.9, we discuss several techniques that researchers can use to optimize a multi-objective MMFBSP. We test our model by solving several problems from the literature. We also show how to solve multi-objective optimization problems by using CPLEX 12.9 and how computation time increases as problem size increases. The small increase in computation time compared with possible cost savings make exact models a must for practitioners. Moreover, the linear programming-relaxation of the model, which takes seconds, can provide an excellent lower bound.

关键词: multi-objective optimization     finance-based scheduling     multi-mode project scheduling     mixed-integer linear programming     CPLEX    

Distributionally robust optimization of home energy management system based on receding horizon optimization

Jidong WANG, Boyu CHEN, Peng LI, Yanbo CHE

《能源前沿(英文)》 2020年 第14卷 第2期   页码 254-266 doi: 10.1007/s11708-020-0665-4

摘要: This paper investigates the scheduling strategy of schedulable load in home energy management system (HEMS) under uncertain environment by proposing a distributionally robust optimization (DRO) method based on receding horizon optimization (RHO-DRO). First, the optimization model of HEMS, which contains uncertain variable outdoor temperature and hot water demand, is established and the scheduling problem is developed into a mixed integer linear programming (MILP) by using the DRO method based on the ambiguity sets of the probability distribution of uncertain variables. Combined with RHO, the MILP is solved in a rolling fashion using the latest update data related to uncertain variables. The simulation results demonstrate that the scheduling results are robust under uncertain environment while satisfying all operating constraints with little violation of user thermal comfort. Furthermore, compared with the robust optimization (RO) method, the RHO-DRO method proposed in this paper has a lower conservation and can save more electricity for users.

关键词: distributionally robust optimization (DRO)     home energy management system (HEMS)     receding horizon optimization (RHO)     uncertainties    

Multi-timescale optimization scheduling of interconnected data centers based on model predictive control

《能源前沿(英文)》 doi: 10.1007/s11708-023-0912-6

摘要: With the promotion of “dual carbon” strategy, data center (DC) access to high-penetration renewable energy sources (RESs) has become a trend in the industry. However, the uncertainty of RES poses challenges to the safe and stable operation of DCs and power grids. In this paper, a multi-timescale optimal scheduling model is established for interconnected data centers (IDCs) based on model predictive control (MPC), including day-ahead optimization, intraday rolling optimization, and intraday real-time correction. The day-ahead optimization stage aims at the lowest operating cost, the rolling optimization stage aims at the lowest intraday economic cost, and the real-time correction aims at the lowest power fluctuation, eliminating the impact of prediction errors through coordinated multi-timescale optimization. The simulation results show that the economic loss is reduced by 19.6%, and the power fluctuation is decreased by 15.23%.

关键词: model predictive control     interconnected data center     multi-timescale     optimized scheduling     distributed power supply     landscape uncertainty    

Robust energy-efficient train speed profile optimization in a scenario-based position–time–speed network

《工程管理前沿(英文)》 2021年 第8卷 第4期   页码 595-614 doi: 10.1007/s42524-021-0173-1

摘要: Train speed profile optimization is an efficient approach to reducing energy consumption in urban rail transit systems. Different from most existing studies that assume deterministic parameters as model inputs, this paper proposes a robust energy-efficient train speed profile optimization approach by considering the uncertainty of train modeling parameters. Specifically, we first construct a scenario-based position–time–speed (PTS) network by considering resistance parameters as discrete scenario-based random variables. Then, a percentile reliability model is proposed to generate a robust train speed profile, by which the scenario-based energy consumption is less than the model objective value at α confidence level. To solve the model efficiently, we present several algorithms to eliminate the infeasible nodes and arcs in the PTS network and propose a model reformulation strategy to transform the original model into an equivalent linear programming model. Lastly, on the basis of our field test data collected in Beijing metro Yizhuang line, a series of experiments are conducted to verify the effectiveness of the model and analyze the influences of parameter uncertainties on the generated train speed profile.

关键词: robust train speed profile     percentile reliability model     scenario-based position–time–speed network     mixed-integer programming    

AGCD: a robust periodicity analysis method based on approximate greatest common divisor

Juan YU,Pei-zhong LU

《信息与电子工程前沿(英文)》 2015年 第16卷 第6期   页码 466-473 doi: 10.1631/FITEE.1400345

摘要: Periodicity is one of the most common phenomena in the physical world. The problem of periodicity analysis (or period detection) is a research topic in several areas, such as signal processing and data mining. However, period detection is a very challenging problem, due to the sparsity and noisiness of observational datasets of periodic events. This paper focuses on the problem of period detection from sparse and noisy observational datasets. To solve the problem, a novel method based on the approximate greatest common divisor (AGCD) is proposed. The proposed method is robust to sparseness and noise, and is efficient. Moreover, unlike most existing methods, it does not need prior knowledge of the rough range of the period. To evaluate the accuracy and efficiency of the proposed method, comprehensive experiments on synthetic data are conducted. Experimental results show that our method can yield highly accurate results with small datasets, is more robust to sparseness and noise, and is less sensitive to the magnitude of period than compared methods.

关键词: Periodicity analysis     Period detection     Sparsity     Noise     Approximate greatest common divisor (AGCD)    

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

《机械工程前沿(英文)》 2015年 第10卷 第4期   页码 392-404 doi: 10.1007/s11465-015-0353-y

摘要:

For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.

关键词: integrated process planning and scheduling (IPPS)     dispatching rules     priority based optimization algorithm     multi-objective optimization    

Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving

Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB

《工程管理前沿(英文)》 2022年 第9卷 第1期   页码 117-134 doi: 10.1007/s42524-020-0115-3

摘要: Grand infrastructure projects, such as dam, power plant, petroleum, and gas industry projects, have several contractors working on them in several independent sub-projects. The concern of reducing the duration of these projects is one of the important issues among various aspects; thus, our aim is to fulfill the requirements by using the game theory approach. In this study, a mixed-integer programming model consisting of game theory and project scheduling is developed to reduce the duration of projects with a minimum increase in costs. In this model, two contractors in successive periods are entered into a step-by-step competition by the employer during dynamic games, considering an exchange in their limited resources. The optimum solution of the game in each stage are selected as the strategy, and the resources during the game are considered to be renewable and limited. The strategy of each contractor can be described as follows: 1) share their resources with the other contractor and 2) not share the resources with the other contractor. This model can act dynamically in all circumstances during project implementation. If a player chooses a non-optimum strategy, then this strategy can immediately update itself at the succeeding time period. The proposed model is solved using the exact Benders decomposition method, which is coded in GAMS software. The results suggest the implementation of four step-by-step games between the contractors. Then, the results of our model are compared with those of the conventional models. The projects’ duration in our model is reduced by 22.2%. The nominal revenue of both contractors has also reached a significant value of 46078 units compared with the relative value of zero units in the original model. Moreover, we observed in both projects the decreases of 19.5%, 20.9%, and 19.7% in the total stagnation of resources of types 1, 2, and 3, respectively.

关键词: project scheduling     resource leveling between projects     constrained resources     game theory     Benders decomposition    

Robust topology optimization of hinge-free compliant mechanisms with material uncertainties based on

Junjie ZHAN, Yangjun LUO

《机械工程前沿(英文)》 2019年 第14卷 第2期   页码 201-212 doi: 10.1007/s11465-019-0529-y

摘要: This paper presents a new robust topology optimization framework for hinge-free compliant mechanisms with spatially varying material uncertainties, which are described using a non-probabilistic bounded field model. Bounded field uncertainties are efficiently represented by a reduced set of uncertain-but-bounded coefficients on the basis of the series expansion method. Robust topology optimization of compliant mechanisms is then defined to minimize the variation in output displacement under constraints of the mean displacement and predefined material volume. The nest optimization problem is solved using a gradient-based optimization algorithm. Numerical examples are presented to illustrate the effectiveness of the proposed method for circumventing hinges in topology optimization of compliant mechanisms.

关键词: compliant mechanisms     robust topology optimization     hinges     uncertainty     bounded field    

MAS-based production scheduling system for manufacturing cell-based workshop

CHU Hong-yan, CAO Quan-jun, FEI Ren-yuan

《机械工程前沿(英文)》 2006年 第1卷 第4期   页码 375-380 doi: 10.1007/s11465-006-0043-x

摘要: The task of production scheduling is to determine the detailed machining path, time, machine tool, etc., for every work piece, according to the production objective and constraints. It is also an important part of the manufacturing system. In this paper, the manufacturing cell-based workshop is described and its scheduling system structure is established based on MAS (multi-agent system) technology. Through the negotiation and communication of each agent, the machining path is determined and the machining sequence and start time are calculated by GA (genetics algorithm). The communication among agents uses the CORBA (common object request broker architecture) technology of the OMG (Object Management Group). The CORBA-based architecture of the communication is designed and some interfaces for the communication are listed. For the genetics algorithm, chromosome coding, fitness function, parameters selection, and the basic genetics operation including selection, crossover and aberrance, are described. The scheduling system also can deal with some abnormal conditions, such as machine tool failure and urgent tasks. Finally, two scheduling examples are given.

关键词: negotiation     selection     multi-agent     communication     abnormal    

标题 作者 时间 类型 操作

Novel slack-based robust scheduling rule for a semiconductor manufacturing system with uncertain processing

Juan LIU, Fei QIAO, Yumin MA, Weichang KONG

期刊论文

Reliability-based robust design optimization of vehicle components, Part I: Theory

Yimin ZHANG

期刊论文

Reliability-based robust design optimization of vehicle components, Part II: Case studies

Yimin ZHANG

期刊论文

Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times

Pankaj SHARMA,Ajai JAIN

期刊论文

A carbon efficiency upgrading method for mechanical machining based on scheduling optimization strategy

Shuo ZHU, Hua ZHANG, Zhigang JIANG, Bernard HON

期刊论文

Robust control of

Xueyan TANG, I-Ming CHEN

期刊论文

Multi-objective optimization for the multi-mode finance-based project scheduling problem

Sameh Al-SHIHABI, Mohammad AlDURGAM

期刊论文

Distributionally robust optimization of home energy management system based on receding horizon optimization

Jidong WANG, Boyu CHEN, Peng LI, Yanbo CHE

期刊论文

Multi-timescale optimization scheduling of interconnected data centers based on model predictive control

期刊论文

Robust energy-efficient train speed profile optimization in a scenario-based position–time–speed network

期刊论文

AGCD: a robust periodicity analysis method based on approximate greatest common divisor

Juan YU,Pei-zhong LU

期刊论文

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

期刊论文

Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving

Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB

期刊论文

Robust topology optimization of hinge-free compliant mechanisms with material uncertainties based on

Junjie ZHAN, Yangjun LUO

期刊论文

MAS-based production scheduling system for manufacturing cell-based workshop

CHU Hong-yan, CAO Quan-jun, FEI Ren-yuan

期刊论文